general
Translated · English · 2–5m lag
The second letter: "The nodu between A0-A3 was completed from 82 to 208 hectares". What the former Minister of Transport claims
USR Member Cătálin Drúła, former Minister of Transport, appreciates that the road nodu between Autostrada A0 and Bustrada A3 is built on a larger surface than it was necessary, which has generated additional costs of 61 million of it, but...
Reported by Digi24
Read the complete report at Digi24 ↗
Verification notice
IntelMap indexes open-source reporting. This page identifies what a source reported; it does not independently confirm the claim.
3 reports · 3 sources
Digi24The second letter: "The nodu between A0-A3 was completed from 82 to 208 hectares". What the former Minister of Transport claimsDigi24The second letter: "The nodu between A0-A3 was completed from 82 to 208 hectares". What the former Minister of Transport claimsHotnews.ro"The nodu between A0 and A3 has been completed at 208 hectares," says an former Transport Minister.5 recorded states
Signal first indexedP1 · 72% quality · 2 sources
Corroboration 2→3 sources · quality 72→80P1 · 80% quality · 3 sources
Quality 80→88P1 · 88% quality · 3 sources
Quality 88→96P1 · 96% quality · 3 sources
Quality 96→99P1 · 99% quality · 3 sources