general Translated · English · 2–5m lag

The second letter: "The nodu between A0-A3 was completed from 82 to 208 hectares". What the former Minister of Transport claims

USR Member Cătálin Drúła, former Minister of Transport, appreciates that the road nodu between Autostrada A0 and Bustrada A3 is built on a larger surface than it was necessary, which has generated additional costs of 61 million of it, but...

Reported by Digi24
Read the complete report at Digi24 ↗
Verification notice

IntelMap indexes open-source reporting. This page identifies what a source reported; it does not independently confirm the claim.

INCIDENT FUSION

3 reports · 3 sources

Digi24The second letter: "The nodu between A0-A3 was completed from 82 to 208 hectares". What the former Minister of Transport claimsDigi24The second letter: "The nodu between A0-A3 was completed from 82 to 208 hectares". What the former Minister of Transport claimsHotnews.ro"The nodu between A0 and A3 has been completed at 208 hectares," says an former Transport Minister.
INCIDENT EVOLUTION

5 recorded states

Signal first indexedP1 · 72% quality · 2 sources

Corroboration 2→3 sources · quality 72→80P1 · 80% quality · 3 sources

Quality 80→88P1 · 88% quality · 3 sources

Quality 88→96P1 · 96% quality · 3 sources

Quality 96→99P1 · 99% quality · 3 sources

Explore this day in the archive →
QUALITY CONTROL

Report this signal

Reports are anonymous and retained privately for editorial review.