general
Archived signal Translated · English · 2–5m lag
From Monday to Thursday, the movement in 320 meters from Dunav bridge at Russia will be two-way in one tape.
They will be able to build water-based equipment In the next two weeks on Monday to Thursday, the movement in 320 metres from Dunav bridge in Russia will be twice in a panel for the installation of water-driven equipment at bridges, reports by API.
Reported by 24chasa.bg
Read the complete report at 24chasa.bg ↗
Verification notice
IntelMap indexes open-source reporting. This page identifies what a source reported; it does not independently confirm the claim.
1 recorded state
Signal first indexedP1 · 68% quality · 1 source