General
Translated · English · 2–5 min delay
The Sanction of the Pelesch Bridge runs through spring, causing greater damage than is expected: In the walls the water flow and flow
Croatian Road Management President Ivica Budimir said that the construction of the Pelšký bridge would start in spring 2027 and that it would be worse than expected.
Reported by Klix.ba
Read the complete report at Klix.ba ↗
Verification notice
IntelMap indexes open-source reporting. This page identifies what a source reported; it does not independently confirm the claim.
Recorded states: 1
Signal first indexedP1 · Quality: 68% · Sources: 1