General Translated · English · 2–5 min delay

The Sanction of the Pelesch Bridge runs through spring, causing greater damage than is expected: In the walls the water flow and flow

Croatian Road Management President Ivica Budimir said that the construction of the Pelšký bridge would start in spring 2027 and that it would be worse than expected.

Reported by Klix.ba
Read the complete report at Klix.ba ↗
Verification notice

IntelMap indexes open-source reporting. This page identifies what a source reported; it does not independently confirm the claim.

INCIDENT EVOLUTION

Recorded states: 1

Signal first indexedP1 · Quality: 68% · Sources: 1

Explore this day in the archive →
QUALITY CONTROL

Report this signal

Reports are anonymous and retained privately for editorial review.